Build a template with work before and after transplanting
Garden preparation and base fertiliser as “7 days before transplanting”, sprays as “Day 15” — all counted from transplanting.
- Open Schedules → Templates and tap New. Leave Day 1 is on Transplanting for a transplanted crop.
- For work before transplanting, tap Step before transplanting and type how many days before — 7 for preparing the beds, 1 for the base fertiliser.
- For everything after, tap Step from transplanting and type the day. The transplant day itself is Day 1, so a spray two weeks later is Day 15.
- Add the activity, the products and doses, and any instructions to each step.
- Type a date in Try it with a date to see exactly where each step would land. Nothing is dated until the template is used.
- To recreate one of your schedules, open it and tap Template instead: choose Transplanting, type the transplant date, and every application is counted from it — earlier ones become days before. Change the date and the steps follow.
- Tap Save template. Edit on the template’s page changes it later.